Categories
-
-
Shared power and communications pit installed.
-
OptiGroup changed over all the high bay lighting in this workshop to LED. What a difference!
-
Before and after photos of a data cabinet. Optigroup installed cable tray back to back. One section was for all data and phone looms. The other was for all CCTV cabling.
|